Despiece carroceria Matra Aleron + Retros
Despiece carroceria Matra Aleron + Retros

Matra Bodywork Breakdown Wing + Mirrors

Last items in stock
€5.48
Tax included
Original Slot.it wing and mirrors for the Matra body (ref. SICS27P). Replacement parts with the usual level of detail from the brand, designed to replace or customise your model without compromising the factory finish.

 

Slot.it Wing and Mirrors for Matra Bodyshell: Original Spare Part with All the Brand Detail

The SICS27P is the official spare parts kit from Slot.it that includes the rear wing and mirrors corresponding to the Matra bodyshell in their catalogue. Two small pieces in appearance, but crucial when we talk about fidelity to the model and presentation on track or in display.

Function and Performance

The wing and mirrors are not merely aesthetic elements. In a well-finished model, these parts complete the silhouette of the prototype and provide the visual coherence that distinguishes a well-cared-for car from one that lacks that final detail. Slot.it manufactures them with the same rigor applied to the rest of their range of bodyshells and spare parts, ensuring a precise fit on the corresponding Matra bodyshell.

Compatibility

This spare part is specifically designed for the Matra bodyshell from Slot.it. If you have doubts about whether it fits your specific version of the model, please consult us before placing your order: the reference SICS27P is the key to correctly identifying it in the official catalogue.

Assembly and Preparation

The assembly of these parts does not require special tools. A minimal attention to aligning the wing to ensure it is symmetrical is sufficient, something you will especially appreciate if the car is going to compete or be displayed. If your intention is to paint the bodyshell before assembling, we recommend leaving these parts loose until the last step to better access the areas underneath the wing.

Ideal for…

  • Replacing damaged parts after a track accident.
  • Completing bodyshells purchased without accessories.
  • Preparers and customisers looking for original Slot.it parts for their projects.
  • Collectors who demand maximum detail in their models from the brand.

Frequently Asked Questions

Does this spare part include only the wing and mirrors, or are there more pieces?

According to reference SICS27P, the kit includes the rear wing and mirrors for the Matra bodyshell from Slot.it. If you need other parts of the same bodyshell, check the rest of the spare parts available in the brand's catalogue.

Is it compatible with all versions of the Matra bodyshell from Slot.it?

It is designed for the Matra bodyshells in the Slot.it catalogue referenced by this spare part. If you have a specific version of the model, we recommend confirming it with us before ordering.

Can I paint it with water-based paints like Vallejo or Tamiya?

Yes. The bodyshell parts from Slot.it easily accept acrylic paints from brands like Vallejo or Tamiya. A prior primer is recommended to improve adhesion, especially in small areas like the mirrors.

How do I know if I need this spare part or the complete bodyshell spare parts set?

If you only have the wing or a mirror damaged or lost, the SICS27P is exactly what you need. If the damage affects other parts of the bodyshell, check the complete Matra spare parts catalogue from Slot.it.

The Slot.it SICS27P body parts set includes the rear wing and mirrors for the Matra bodyshell, offering an exact OEM fit and precise detail. A must-have spare part for Slot.it Matra collectors and slot car racers looking to restore or customise their model with genuine manufacturer components. Available at Ministry of Hobby, your trusted slot car and scale modelling specialist.

SICS27P
1 Item
No reviews
Comments (0)
No customer reviews for the moment.
Product added to wishlist

Este sitio web utiliza cookies propias y de terceros para mejorar nuestros servicios y mostrarle publicidad relacionada con sus preferencias mediante el análisis de sus hábitos de navegación. Para dar su consentimiento sobre su uso pulse el botón Acepto.