The original windows your Slot.it Jaguar XJR10 needs
With the reference SICS42V, Slot.it offers you the specific window set for the body of the legendary Jaguar XJR10, one of the most iconic Group C prototypes in the history of motorsport. Having original spare parts is the best guarantee to maintain the visual fidelity and factory finish of your model.
Function and fit
These windows are part of the official bodywork spare parts system from Slot.it for the XJR10. Being parts specifically manufactured for this model, they guarantee a precise fit in the bodywork slots without the need for modifications. Their transparency and geometry are the same as those of the production model, making the result indistinguishable from the original.
When should you replace them?
- When the original windows show visible scratches from track wear or handling.
- When restoring a painted or tuned body that already had the windows installed.
- If you have disassembled the car to customise the body and the windows have suffered during the process.
- To keep a display or collection model in perfect condition.
Compatibility
This spare part is exclusively compatible with the Slot.it bodywork of the Jaguar XJR10 from the SICS series. Before placing your order, check that your body corresponds to this reference to ensure the fit will be correct.
Slot.it and its spare parts philosophy
One of Slot.it's hallmarks is precisely the availability of a detailed and updated spare parts catalogue, covering everything from mechanical elements to body parts as specific as these windows. This philosophy allows any collector or club racer to keep their models in perfect condition for years without having to purchase a complete car.
Frequently asked questions
Are these windows suitable for all versions of the Slot.it Jaguar XJR10?
They are specific to the bodywork of the Slot.it SICS series for the Jaguar XJR10. If you have doubts about your specific version, check the reference of your body before placing your order.
Do I need special tools to install them?
In general, Slot.it body windows are installed by pressure or with a small application of compatible plastic adhesive, without the need for special tools. We recommend consulting the bodywork breakdown diagram to follow the correct process.
Can I paint them or treat them with masking liquid?
Yes, it is a common practice among enthusiasts of body customisation. Products such as Tamiya masking liquids are compatible with this type of transparent plastic and facilitate painting the frames without staining the glass.
Does the package contain more than one piece?
The exact composition of the package corresponds to the official breakdown from Slot.it for this bodywork. We recommend checking the product image or contacting us if you need to confirm the included units.
The Slot.it SICS42V is the official replacement windscreen and window set for the Jaguar XJR10 body shell, designed to keep your 1/32 scale slot car in showroom condition. A must-have spare part for collectors and club racers looking to restore or maintain their Slot.it Jaguar XJR10 model. Compatible with Slot.it SICS series bodywork, this part ensures a perfect fit with no modifications required.